Monday, February 9, 2009

Hi all, 

We made a fairly substantial change to our design involving the shape of the path.  We were struggling with getting people into the building without needing signs.  After discussing several schemes, we decided on this one.  
View from Garden Ave entrance

View from parking lot entrance
Birds view
At this point, all of our work is shifting towards construction drawing development.  We are shooting for 50% by this coming monday.   That means that we are no longer making large changes to the overall design.  That does not mean that there will be no design changes, but that they will be small, regarding details.  We are still trying to iron out the exact form of the bench, but should have it pretty close by wednesday.  We need help producing construction drawings.  Our primary resource is going to be AutoCAD.  If you are comfortable with the program, that is great.  If you are new to it, do not let it deter you.  Most of us are new to it too. If you have time to help, contact one of us or stop by the studio anytime.  Thanks! Good luck with midterms.  

No comments:

Post a Comment